Policy Answer: Territorial spatial planning and "three regions and three lines" related knowledge

Release time: 2024-02-22 10:28:21 Number of page views: Published by: CAI Liya, Kaifeng Public Resources Trading Center, Kaifeng Land Consolidation and Reserve Center

       1 Q: Before the approval of the national space plan, how to align the transitional policies on the scale, layout and structure of the plan?

A: Before the approval of the territorial spatial planning, the transitional policy cohesion requirements such as planning scale, layout and structure shall be met in accordance with the Notice of the Ministry of Natural Resources on Actively Ensuring the Elements of Land Use and Sea Use (Natural Resources Development)2022129No.) execution。Transitional period,For construction projects that exceed the current general plans for land use and urban and rural plans approved by law,If planning adjustment,It should not conflict with the "three regions and three lines" control requirements,It is in line with the overall requirements of urban functional layout, spatial structure and timing arrangement as determined by the overall territorial space planning of cities and counties,In accordance with the land use, intensity and scale of the area involved in the project,And in accordance with the current regulations and statutory planning control rules and procedures。Agricultural land conversion procedures should be handled in accordance with the current regulations, regardless of the type of project。

 

2 Q: If the demarcation of "three districts and three lines" has been completed, how to handle the project planning land procedures when handling site selection or land acquisition transfer for specific projects?

Answer: When specific projects handle agricultural conversion and land acquisition, they should first be based on the overall land space planning of cities, counties and townships (urban and rural overall planning, land use overall planning) to ensure that the project conforms to the planning。In the areas covered by detailed planning (control detailed planning, village planning), the specific project can be directly based on the detailed planning as the basis for site selection suggestions, and the areas that cannot be covered can be based on the overall territorial space planning of cities, counties and townships。

 

3 Q: How to determine the level of construction land approval involving the ecological protection red line to allow limited human activities?Can we clarify the approval level of such "limited human activities" project land pre-examination?

A: Limited human activities are allowed to involve new construction land, and the approval level of "limited human activities" project land pre-examination is in accordance with the "Notice on Clarifying the main points of land pre-examination work and regulating the format of the Preliminary Examination report of the Department" (Natural capital Use Control Letter202245 No., hereinafter referred to as45The principle should be pre-examined by the provincial department of natural resources, if the provincial people's government in accordance with the Central Office, the State Office of the "Guidance on the Overall delineation and implementation of the Three Lines of Control in the Territorial Space Planning" formulated by the provincial regulation of limited human activities, from its provisions。The conversion of agricultural land and land expropriation shall not change the original examination and approval level and shall be handled in accordance with the current relevant provisions。

 

4 Q: For individual site selection projects located outside the urban development boundary, or urban roads that have a liaison role between the two urban development boundaries, under the premise of meeting the new "three districts and three lines" control requirements, how to prepare the "planned land use adjustment Plan"??

A: The arrangement of construction projects should not conflict with the "three districts and three lines" control requirements, meet the overall requirements of urban functional layout, spatial structure and timing arrangement determined by the overall territorial spatial planning of cities and counties, and meet the land use, intensity and scale of the areas involved in the project。Where the red line of ecological protection is occupied, it must be complied with142Sign regulation。

 

5 Q: If the zoning base of the urban development boundary in the territorial space planning is small, according to the requirements of the urban development boundary demarcation, there are cases that the original permitted construction areas are not fully included in the zoning, how to deal with it?

A: In accordance with the Notice of the Ministry of Natural Resources on the relevant work of territorial Spatial Planning in the near future (Natural Resources Development2020183No.) Clear "New urban construction land should in principle be distributed within the urban development boundaries submitted for approval, and comply with the implementation of spatial control requirements such as the overall" three control lines "in territorial spatial planning。

 

6 Q: How to determine whether the project land is in line with the national space plan if the detailed spatial location has not been determined?The project that has not yet determined the detailed spatial location is adjusted according to the legal approval, and the location and scale are gradually and accurately determined. How to operate?

A: Project land within urban development boundaries,It should not conflict with the "three regions and three lines" control requirements,It is in line with the overall requirements of urban functional layout, spatial structure and timing arrangement as determined by the overall territorial space planning of cities and counties,In accordance with the land use, intensity and scale of the area involved in the project, and combined with controlled detailed planning preparation and modification to achieve accurate maps。20227Notice on Expediting the Inclusion of a "One Plan" for Land and Space Construction Projects in the Road and Water Transport Category (hereinafter referred to as the Notice),For road and water transport projects, it is required to gradually improve the accurate location of the country。Individual site selection projects outside the urban development boundary that have not determined the detailed spatial location can be implemented in accordance with the provisions of the Notice, but the requirements of the accurate location map should be strictly implemented to ensure that the spatial layout of various needs does not conflict。

 


All rights reserved:Kaifeng city public resources trading information networkHost: Kaifeng public resources trading information network
Address: Kaifeng City citizens home 5th floor 邮编:475000 Email: kfggzyjyzx2018@163.com Website record number:Yu ICP prepared No. 12001764-1

Technical support:Zhengzhou Xinyuan Information Technology Co., LTD